Motorists traveling through the Nacogdoches South Loop and Highway 59 interchange ark asked to slow down and observe warning signs as changes are made with the traffic flow in that area, specifically for northbound motorists exiting US 59 onto Loop 224 westbound. 

According to a release from the Texas Department of Transportation (TxDOT), Webber LLC, contractor for the $5.9 million project, will close the existing cloverleaf entry ramp to motorists exiting US 59 onto SL 224 west or continuing northbound on US 59.

Motorists wishing to continue on US 59 northbound or travel on the west loop will need to utilize the left two lanes and turn left under the existing US 59/SL 224 bridge and enter the loop using the newly reconstructed westbound entrance ramp. Motorists can expect lighted message boards warning of the switch and law enforcement officers will be monitoring traffic.

The project is designed to reconfigure the intersection, improve traffic signals and add a left and right turn lane. The finished project will provide for better maneuverability, address congestion, maintain a safe system and provide a smoother traffic flow.

As construction continues on US 59 and SL 224, motorists are advised to stay alert to workers and heavy equipment throughout the construction projects. Remember traffic fines double when workers are present.

More From Kicks 105