Loop 224

Flyover the Nacogdoches Future
Flyover the Nacogdoches Future
Flyover the Nacogdoches Future
In early 2017, if all goes well, the South Nacogdoches Highway 59 construction project should be completed.  As you drive through that area just south of Loop 224, it's hard to envision exactly what the finished product will look like.
Traffic Flow Changes
Traffic Flow Changes
Traffic Flow Changes
Motorists traveling through the Nacogdoches South Loop and Highway 59 interchange ark asked to slow down and observe warning signs as changes are made with the traffic flow in that area, specifically for northbound motorists exiting US 59 onto Loop 224 westbound.